< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=1270080321429013&ev=PageView&noscript=1" />

Unit bathroom

Main product:

Ceiling

Bathtub

Shower chassis

 

Process:

1, Cut the composite material according to the requirements of product size, shape, thickness, etc.

2, use a robot or personnel to put the material into the mold of the hydraulic press according to the requirements;

3, Surpress the pressing button, do the pressing, exhaust, forming, and pressure holding;

4, After pressure holding, open the mold and take out the product